Home Improvements UK 2026 — Costs, Planning Rules, Grants and Adding ValueBuilding Regulations Guide UK — What You Need to Know
What Building Regulations are, when you need approval, how to apply, common projects that require Building Regs, and the penalties for non-compliance.
Building Regulations ensure building work is safe, energy-efficient, and structurally sound. Here’s when you need approval and how to get it.
Building Regulations vs Planning Permission
| Feature | Building Regulations | Planning Permission |
|---|
| What it controls | HOW you build — safety, structure, energy, drainage | WHAT and WHERE — appearance, size, impact |
| Who enforces | Local authority Building Control or approved inspectors | Local planning authority |
| When needed | Nearly all building work | Depends on size, location, type of work |
| Application fee | Varies (see below) | Varies (see planning permission guide) |
| Certificate | Completion certificate | Planning approval notice |
| Penalty for non-compliance | Enforcement notice, prosecution, fines | Enforcement notice, demolition order |
What the Building Regulations Cover
| Approved Document | Subject |
|---|
| Part A | Structure (foundations, walls, loading) |
| Part B | Fire safety (escape routes, fire spread, access for fire services) |
| Part C | Site preparation and resistance to contaminants and moisture |
| Part D | Toxic substances |
| Part E | Resistance to sound (soundproofing between dwellings) |
| Part F | Ventilation |
| Part G | Sanitation, hot water safety, water efficiency |
| Part H | Drainage and waste disposal |
| Part J | Combustion appliances and fuel storage |
| Part K | Protection from falling (stairs, ramps, guards) |
| Part L | Conservation of fuel and power (energy efficiency) |
| Part M | Access to and use of buildings (accessibility) |
| Part O | Overheating (new builds and some extensions) |
| Part P | Electrical safety (dwellings) |
| Part Q | Security (new dwellings — doors and windows) |
| Part R | Physical infrastructure for high-speed electronic communications |
| Part S | Infrastructure for charging electric vehicles |
Projects That Need Building Regulations
| Project | Building Regs needed? | Key parts |
|---|
| Extension | Yes | A, B, E, F, G, H, J, K, L, M, P |
| Loft conversion | Yes | A, B, F, K, L, P |
| Garage conversion | Yes | A, B, F, L, P |
| Structural alterations (removing walls) | Yes | A |
| New boiler/heating system | Yes (or competent person scheme) | J, L |
| Replacement windows/doors | Yes (or FENSA/competent person) | L, N, Q |
| Electrical work (bathrooms, kitchens, new circuits) | Yes (or competent person — Part P) | P |
| New bathroom/WC | Yes | G, H, F, P |
| Re-roofing | Yes (if more than 25% of the area) | L |
| Underpinning | Yes | A |
| Basement conversion | Yes | A, B, C, F, K, L, M |
| Solar panels | Usually not (if on-roof) | May need if structural |
| New build | Yes — everything | All parts |
Work That Usually Doesn’t Need Building Regulations
| Work | Condition |
|---|
| Like-for-like repairs | Replacing materials with the same specification |
| Small detached buildings | Under 15m² with no sleeping accommodation |
| Porches | Under 30m², single storey, at ground level |
| Conservatories | Under 30m², at ground level, separated from the house by an external-quality wall/door, with independent heating controls |
| Carports | Open on at least two sides, under 30m² |
| Garden walls, fences, gates | Under certain heights |
| Internal decorating | No structural changes |
| External painting | No change to materials/structure |
How to Apply
Two Routes
| Route | Detail |
|---|
| Local authority Building Control | Your council’s Building Control department |
| Approved Inspector | A private sector alternative (must be registered with CICAIR) |
Application Types
| Type | When | How it works |
|---|
| Full plans application | Major work (extensions, conversions, structural) | Submit detailed plans → Building Control checks → approve with/without conditions → inspect during work → completion certificate |
| Building notice | Smaller work (where plans aren’t needed) | Notify Building Control 48 hours before starting → they inspect during work → completion certificate |
| Regularisation | Work already done without approval | Apply retrospectively → Building Control inspects → may require opening up work for inspection → regularisation certificate (if compliant) |
Fees (Approximate)
| Project | Building Control fee (approx.) |
|---|
| Small extension (up to 40m²) | £400–£800 |
| Medium extension (40–80m²) | £600–£1,200 |
| Loft conversion | £400–£900 |
| Garage conversion | £300–£600 |
| Structural alterations | £200–£500 |
| Electrical work (full plans) | £200–£400 |
| New dwelling | £1,000–£3,000 |
| Regularisation application | +25–50% on top of the standard fee |
Fees vary by council.
Competent Person Schemes
| Scheme | Trades | What it means |
|---|
| Gas Safe | Gas boilers, heating | Installer self-certifies compliance — no separate Building Regs application needed |
| FENSA/CERTASS | Replacement windows and doors | Self-certification for Part L compliance |
| NICEIC/NAPIT/ELECSA | Electrical work | Self-certification for Part P compliance |
| HETAS | Solid fuel stoves and installations | Self-certification |
| OFTEC | Oil heating | Self-certification |
| MCS | Renewable energy (solar, heat pumps) | Self-certification |
Key: If your installer is registered with a competent person scheme, they can self-certify the work and notify Building Control on your behalf — saving you the application fee and hassle.
Inspections
| Stage | When |
|---|
| Commencement | When work starts (or foundations are dug) |
| Foundations | Before concrete is poured |
| Damp-proof course | Before walls are built above DPC level |
| Drainage | Before trenches are filled |
| Structural work | Before covering steels, beams, etc. |
| Pre-plaster | Before walls are plastered (insulation, fire stopping, ventilation) |
| Completion | Final inspection before occupation/use |
Completion Certificates
| Feature | Detail |
|---|
| What it is | Official confirmation that the work complies with Building Regulations |
| Who issues it | Local authority Building Control or the approved inspector |
| When you get it | After the final inspection and any issues are resolved |
| Why it matters | Required for property sales, mortgage applications, and insurance |
| Keep it safe | You’ll need it when you sell your property |
| Missing certificate? | Apply for a regularisation certificate — or buy indemnity insurance |
Penalties for Non-Compliance
| Penalty | Detail |
|---|
| Enforcement notice | Council orders you to alter or remove non-compliant work |
| Prosecution | Council can prosecute — fines are unlimited |
| Property sale problems | Buyer’s solicitor will spot missing certificates — can delay or collapse a sale |
| Insurance issues | Some insurers won’t cover unapproved work |
| Mortgage problems | Lenders may refuse to lend on properties with unapproved work |
| Safety risk | Non-compliant work may be structurally unsafe, a fire risk, or energy-inefficient |
Useful Links
Your home may be repossessed if you do not keep up repayments on your mortgage. PocketWise provides information and guidance, not financial advice. Seek independent mortgage advice before making decisions about borrowing.