If you’re planning building work near a shared wall or boundary, you may need a party wall agreement. Here’s how the process works.
What Is a Party Wall?
| Type | Description |
|---|
| Party wall | A wall shared between two properties (e.g. the wall between semi-detached or terraced houses) |
| Party fence wall | A wall on a boundary that isn’t part of a building (e.g. a garden wall on the boundary) |
| Party structure | A floor or other structure shared between properties (e.g. a flat floor/ceiling) |
| Boundary | The line separating your property from your neighbour’s |
When You Need to Serve Notice
| Work planned | Notice required? |
|---|
| Building on or along the boundary line | Yes — Party Structure Notice |
| Cutting into a party wall (e.g. inserting a beam) | Yes — Party Structure Notice |
| Making a party wall taller, shorter, or deeper | Yes — Party Structure Notice |
| Removing a chimney breast on a party wall | Yes — Party Structure Notice |
| Loft conversion involving the party wall | Yes — Party Structure Notice |
| Excavation within 3 metres of neighbour’s wall/structure and deeper than their foundations | Yes — Notice of Adjacent Excavation |
| Excavation within 6 metres cutting a 45° line from bottom of neighbour’s foundations | Yes — Notice of Adjacent Excavation |
| Building an extension near the boundary | Usually yes (depends on proximity) |
| Internal work that doesn’t affect party wall | No |
| Work more than 6 metres from any neighbour’s structure | No |
The Party Wall Process
| Step | Action | Timeframe |
|---|
| 1 | Decide what work you’re planning | Before serving notice |
| 2 | Serve a party wall notice on all affected neighbours | At least 2 months before work starts (1 month for excavation) |
| 3 | Neighbour responds: consent or dissent | Neighbour has 14 days to respond |
| 4a | If consent: proceed with work (no surveyor needed) | Immediate |
| 4b | If dissent or no response: appoint party wall surveyor(s) | Allow 4–8 weeks |
| 5 | Surveyor produces a party wall award | Sets out terms, schedule of condition, and payment responsibilities |
| 6 | Begin work in accordance with the award | Follow all conditions |
| 7 | After work: surveyor inspects for any damage | Within reasonable time |
Serving Notice
| Element | Detail |
|---|
| Form | Written notice (template letters available online or from your surveyor) |
| How to serve | Hand-deliver or send by post (keep proof) |
| What it must include | Your name and address, the address of the building, details of the proposed work, proposed start date |
| Timing | At least 2 months before work starts (Line of Junction or Party Structure Notice), 1 month for excavation notice |
| Expires | If work hasn’t started within 12 months, you must serve a new notice |
Three Types of Notice
| Notice type | When to use |
|---|
| Line of Junction Notice | Building a new wall on or along the boundary line |
| Party Structure Notice | Work affecting an existing party wall or party structure |
| Notice of Adjacent Excavation | Excavation within 3 or 6 metres of neighbour’s structure |
What Your Neighbour Can Do
| Response | What happens next |
|---|
| Consent (in writing) | Work can proceed — no surveyor needed |
| Dissent (in writing) | Surveyor process begins |
| No response within 14 days | Treated as a deemed dissent — surveyor process begins |
Party Wall Surveyors
| Option | Detail |
|---|
| Agreed surveyor | Both parties agree on one surveyor to act for both — cheaper and simpler |
| Two surveyors | Each party appoints their own surveyor — the two surveyors then produce the award |
| Third surveyor | If the two surveyors can’t agree, a third surveyor is appointed to resolve the dispute |
Costs
| Scenario | Typical cost |
|---|
| Neighbour consents | £0 (no surveyor needed) |
| Agreed surveyor (simple case) | £1,000–£2,000 |
| Two surveyors (you pay both) | £1,500–£3,500 |
| Complex case (basement, major structural) | £3,000–£10,000+ |
Important: As the building owner (the one doing the work), you usually pay all surveyor costs — both your surveyor and your neighbour’s.
The Party Wall Award
| Element | What it covers |
|---|
| Details of the work | Exactly what work is permitted |
| Schedule of condition | Photographic and written record of the neighbour’s property before work starts |
| Method of working | How the work should be carried out |
| Working hours | When work can take place |
| Access | Whether access to the neighbour’s property is needed |
| Cost responsibility | Who pays for what (usually the building owner) |
| Damage | How any damage will be dealt with and who pays for repairs |
Dispute Resolution
| Issue | Resolution |
|---|
| Disagree with the award | Appeal to the County Court within 14 days |
| Damage caused during work | Surveyor inspects and determines responsibility (usually building owner pays) |
| Neighbour refuses access for schedule of condition | Surveyor records what they can from outside |
| Work doesn’t comply with the award | Neighbour can seek injunction or claim for damages |
Common Scenarios
| Project | Likely notices needed |
|---|
| Rear extension | Party Structure Notice (if near party wall) + possible excavation notice |
| Loft conversion | Party Structure Notice (cutting into or raising party wall) |
| Basement conversion | Excavation notice + Party Structure Notice |
| Removing chimney breast | Party Structure Notice |
| New garden wall on boundary | Line of Junction Notice |
| Underpinning | Excavation notice |
| Kitchen extension (side return) | Party Structure Notice + possible excavation notice |
Tips for a Smooth Process
| Tip | Detail |
|---|
| Talk to your neighbour first | Explain your plans informally before serving legal notices |
| Serve notice early | Don’t leave it until the last minute — aim for 3+ months before work starts |
| Use an experienced party wall surveyor | They handle the process and reduce conflict |
| Pay for good schedule of condition photos | Protects you if damage is disputed |
| Keep copies of everything | Notices, responses, the award, photos |
| Be a good neighbour | Minimise disruption, stick to agreed hours, communicate |